top of page

Koppel Bridge

08072020 #5.jpg

Project Details

Location:
Beaver County
Pennsylvania
Client:
Brayman Construction
General Contractor:
Brayman Construction
Completion Date:
April, 2019
Deck Width (FT.):
43
Bridge Deck Area (SQ. FT.):

53,300

Deck Rebar (LBs):

535,000

Total Ties:

57,538

Tie Requirements:
50
% Bottom /
100
% Top
IronBOT LBs Placed

N/A

bottom of page